Guide

How to price AMC contract work so every visit still pays

Updated · 5 min read · By TeamShastra team

Quick answer

If you're stuck on how to price AMC contract work, build the price from the bottom up. Count the visits, the time and travel for each, consumables, any parts you include and a sensible number of breakdown calls. Add a risk buffer and your margin, then compare with what the customer would pay for single visits.

The problem with copying a rival's price

Most AMC prices are guesses. A competitor quoted ₹4,000 a year, so you quote ₹3,500 to win. Then the customer calls six times about a remote that won't pair, your technician drives forty minutes each way, and by month eight you're losing money on every call.

The other mistake is pricing so high that the customer does the maths and decides single visits are cheaper. A good AMC price sits between those two, and you can only find it by counting.

How to price AMC contract work, line by line

  • Preventive visits: how many a year, and how long each takes
  • Travel: time and fuel to reach the site, every visit
  • Consumables: cleaning chemicals, tape, filters or gas top-ups you include
  • Parts: none, a list of small parts, or everything except named costly items
  • Breakdown calls: how many you expect and how many you'll include
  • Paperwork: the report, the bill and the reminder calls
  • Risk buffer: older equipment, far sites, or a demanding customer

Each line has a cost. Add them, then add the margin you want. That's your floor, not your price.

Comprehensive or non-comprehensive

A non-comprehensive AMC covers visits and labour. Parts are quoted when they fail. It's easy to price because your biggest unknown is left out.

A comprehensive AMC includes parts, usually except a named list such as compressors or DVR hard disks. Customers like one fixed bill, but you carry the risk. Inspect before you quote, list existing faults in writing, and price parts based on the age and condition of what you saw, not what you hope.

A pricing worksheet you can copy

Here's a worksheet for a non-comprehensive AMC on six cameras at an office ten kilometres away. All figures are made-up examples; put in your own.

Example AMC pricing worksheet (made-up figures)
LineWorkingYearly cost (example)
Preventive visits4 visits × 2 hours × ₹160 an hour₹1,280
Travel4 visits × ₹150 fuel and time₹600
ConsumablesCleaning kit, ties, tape₹400
Breakdown calls included2 calls × (1.5 hours + travel)₹780
AdminReport, bill, reminders₹300
Risk bufferAbout 15% of the above₹500
Cost floorSum of the lines above₹3,860
MarginYour choice, here about 40% on cost₹1,540
AMC price before GST₹5,400

Now check it from the customer's side. If your single visit charge is ₹800, four visits and two breakdown calls would cost them about ₹4,800 separately. At ₹5,400 the AMC needs a clear extra: faster response, priority booking or free minor parts. Either lower the price or add value they can see.

Breakdown calls: the line that sinks most AMCs

"Unlimited breakdown calls" sounds generous. With older equipment or a nervous customer, it's a blank cheque. Include a fixed number and charge a reduced rate after that, or define what counts as a breakdown, for example equipment not working at all rather than a setting the customer changed.

Track calls per AMC for a year. At renewal, you'll know which customers cost you more than they pay.

Pricing the renewal

Renewal is when you correct last year's guess. Look at what that contract actually cost: visits, calls, parts. If it ran at a loss, raise the price and explain why with facts. If it went smoothly, a small increase or the same price keeps a good customer.

Offer the renewal thirty days before the end date, not after. A customer who's covered without a gap rarely shops around.

Plan the visit schedule so none are missed

Your price assumes you'll do every visit. Missed visits don't save money; they lose renewals. When the contract is signed, put all visit dates on the calendar at once, spaced evenly, and check every week which ones fall due.

Avoid bunching visits for different customers in the same week of the year. Spread them so summer for AC or monsoon for CCTV doesn't bury your team.

GST on the AMC bill

If you're registered, the AMC fee is a taxable service, and the tax invoice must carry the details rule 46 of the CGST Rules lists. Rule 47 gives a time limit for issuing an invoice for services. Show the price before GST on your quote and the tax separately, so the customer isn't surprised by the final figure.

How TeamShastra helps

TeamShastra saves each AMC with its dates, amount and the gap between visits. Due visits show up on their own, and one tap turns a due visit into a job for your technician. You can see which contracts end in the next 30 days, so you can call about renewal before the customer starts comparing prices.

Questions owners ask

Short answers to what people ask us most about this.

How much should a yearly AMC cost?

There's no standard figure. Add the cost of visits, travel, consumables, included parts and expected breakdown calls, add a risk buffer and your margin, then compare with what single visits would cost the customer.

Should breakdown calls be unlimited in an AMC?

Usually not. Include a fixed number and charge a reduced rate after that. Unlimited calls on old equipment can wipe out the whole contract's profit in a few months.

Is a comprehensive AMC more profitable?

It can be, if you inspect the equipment first and price the parts risk honestly. On old or badly maintained equipment it's often a loss, so many firms offer only non-comprehensive cover there.

How do I raise the AMC price at renewal?

Use last year's real cost: visits, calls and parts. Share the facts with the customer a month before the end date. Most reasonable customers accept an increase they can understand.

Sources

We read each official page below on 23 November 2026.

  1. CBIC: CGST Rules, rule 46 (tax invoice)
  2. CBIC: CGST Rules, rule 47 (time limit for issuing a tax invoice)

This guide is general information, not tax or legal advice. Rules change, so check the official source or ask your CA or lawyer. Prices in the worksheet are invented for the example, and the GST points are a summary; confirm invoicing details for your own contracts.

Related guides